EXAMPLE 3 : ONE-OUT-OF-FOUR LOADS
[ All Loads 120 volt only ]
[ For systems with limited backup power ]
  | With PRIORITIZER | Without PRIORITIZER | ||||
Duty Cycle | Load Priority | Load Example | Run Watts | Start Surge | Run Watts | Surge Watts |
6 % | P1 | Well Pump | 1000 | 3000 | 1000 | 3000 |
30 % | P2 | Refrigerator | 800 | 2500 | 800 | 2500 |
25 % | P3 | Deep Freezer | 600 | 2000 | 600 | 2000 |
35 % | P4 | Water Heater | 2000 | 2000 | 2000 | 2000 |
96 % | <-- Total Duty Cycle |   |   |   |   | |
Max. Effective Load --> | 2000 | 3000 | 4400 | 9500 |